Quick answer
American Fork's Building Department (801-763-3060) lists roofing, decks, fences, retaining walls, pools, spas and detached buildings over 200 sq ft among the exterior projects that need a permit. Many projects need a Zoning Clearance Letter from Planning and Zoning before the building permit. Permits go through CityInspect, and an owner-builder form is required if you're doing the work yourself.
American Fork's Building Department is at 275 East 200 North. It runs a two-step process for many projects: Planning and Zoning first, then the building permit. And it puts the responsibility for permits on the property owner.
Who to call
From the city's Building Department page:
- Phone: 801-763-3060
- Address: 275 East 200 North, American Fork, UT 84003
- Hours: Monday through Thursday, 7 a.m. to 5:30 p.m. The city's inspection policy says the office is closed Fridays.
- Chief Building Official: Dan Loveland, [email protected]
- Permit Specialist: Lori Faught, [email protected]
- Portals: CityInspect for Zoning Clearance Letters and CityInspect registration for building projects
What needs a permit
The city's Building Department FAQ lists these exterior projects as needing a permit:
- roofing
- decks
- fences
- retaining walls
- pools and spas
- detached accessory structures over 200 square feet
Buildings under 200 square feet don't need a building permit but must still meet setback and zoning rules. No structure, including a pool, detached garage or patio cover, may encroach into a public utility easement.
The FAQ also says the property owner is responsible for getting every required permit before construction starts. Permits for multifamily, non-owner-occupied, commercial and industrial buildings are issued only to licensed and bonded contractors.
The checklists page has plan checklists for additions, basement finishes and remodels, garages and carports, sheds, pools, solar and electrical meter upgrades, plus the fence ordinance and a subcontractor list. The shed checklist asks for footing and foundation details on a structure over 400 square feet, and the license number, phone and address of the general contractor and each subcontractor.
Step 1: Zoning Clearance Letter
Many projects need a Zoning Clearance Letter first. Use the city's Zoning Clearance Letter checklist to see if yours does. If it does, apply in CityInspect's Planning and Zoning module and wait for the letter before you submit the building permit. Incomplete submittals are not accepted.
Inspections and expiring permits
The city's Building Inspection Policies and Procedures (July 22, 2024) say:
- Inspections are scheduled online through CityInspect, at least one working day ahead. No same-day inspections, and inspections can't be arranged in the field.
- AM inspections run 7:30 to 11:30 a.m.; PM inspections 1 to 4:30 p.m.
- A $125 cancellation fee applies to a cancellation within 3 days, and a $175 re-inspection fee may apply if work isn't ready. No more inspections can be booked until the fee is paid.
- A permit expires after 180 days with no inspection. Restarting takes a new permit, new fees and any newer code requirements.
The Building Department page adds that work done without required inspections is assessed a penalty fee. Put in the contract who pays re-inspection and penalty fees.
Fees
Effective July 1, 2025, residential plan review is 65% of the permit fee, and identical plans are 30% of the plan review fee. The Building Department page says permits issued after December 31, 2025 are charged the new TSSD impact fee of $5,793 (questions to TSSD, 801-756-5231). Permit amounts are on the city's Building Permit Fees page.
Doing the work yourself
The city requires an owner-builder form if you're doing the work yourself, and it cites Utah Code 58-55-305. Under subsection (1)(d), a sole owner can build on their own property for noncommercial use; unpaid helpers working under the owner are covered by (1)(e). The FAQ says you may usually draw your own plans for a personal project, to scale and no smaller than 1/4 inch = 1 foot, though some work needs an engineer's stamp.
Check the contractor
American Fork asks for license numbers for the general contractor and each subcontractor. Look them up on the DOPL license lookup. The licensing guide explains the classifications, and the handyman exemption covers small jobs under $7,000.
Before you sign
- Check whether the project needs a Zoning Clearance Letter first.
- Get the license numbers for the contractor and every sub.
- Agree on who pays cancellation, re-inspection and penalty fees.
- Make sure inspections keep the permit alive inside 180 days.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. Nearby, see Lehi and Pleasant Grove, or all of Utah County. Browse American Fork roofers, fence builders, remodelers, concrete contractors, electricians and plumbers, or get quotes.
Sources
- American Fork, Building Department: contacts, process, owner-builder, fees.
- American Fork, Building Department FAQs: permit list, owner responsibility, plans.
- American Fork, Checklists, Ordinances and Documents.
- American Fork, Building Inspection Policies and Procedures (7/22/2024).
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
Do I need a permit to replace a roof in American Fork?
Yes. American Fork's building FAQ lists roofing among the exterior projects that require a permit, along with decks, fences, retaining walls, pools, spas and detached accessory structures over 200 square feet.
What is a Zoning Clearance Letter in American Fork?
It's a Planning and Zoning approval that some projects need before the Building Department will take the permit. The city has a checklist to tell you whether your project needs one. You apply through the Planning and Zoning module in CityInspect and must have the letter before you submit the building permit.
How are inspections scheduled in American Fork?
Online through CityInspect at least one working day ahead. There are no same-day inspections. The city's 2024 policy lists a $125 fee for cancelling within 3 days and a $175 re-inspection fee if the work isn't ready.
When does an American Fork permit expire?
A permit expires after 180 days with no inspection. To restart, you need a new permit with new fees and any newer code requirements.