Contractors in St. George, Utah

Washington County • Population: 108,713

Showing 0 verified contractors

No contractors found in St. George yet

Check back soon or browse other cities.

Quick answer

St. George's Building Department (61 S Main St, 435-627-4100) takes building permit applications online through its CityInspect portal. A fence or wall needs a permit. Building on ground the city maps as a geologic hazard or an adverse construction condition, including expansive, collapsible or gypsiferous soil, needs a site-specific geotechnical report, and slopes of 21% or more in the hillside overlay need a hillside permit approved by the City Council.

St. George's Building Department issues permits for homes inside city limits, and the city runs every building application through an online portal. The local rules that change a project most are about the ground: the city maps several soil and slope hazards and requires an engineer's report before you build on them.

Applying for a permit

  • Portal: apply online through CityInspect. New users register at the city's registration link. If you already have a CityInspect account with another Utah city, the Building Department page says you still need to register with St. George, using the same credentials.
  • Office: Building Department, 61 S Main St, St. George, UT 84770, phone 435-627-4100.
  • Forms: the Permits and Inspections page lists the building fee sheet, the residential final inspection checklist, and the change of contractor and pool compliance forms.
  • Fences and walls: the city's code enforcement FAQ says a fence or wall needs a permit. Fence rules are in City Code 10-18-1.

The city site doesn't publish a full list of which residential projects need a permit. Call 435-627-4100 before you or your contractor start work you're unsure about.

Gypsum, collapsible soil and other ground problems

St. George adopts the FEMA and Utah Geological Survey hazard maps for the area in City Code 10-13B. The code splits the hazards in two:

  • Geologic hazards: surface fault rupture, earthquake shaking, liquefaction, landslide and rockfall. In the mapped high-risk areas, the applicant submits a report from a licensed engineering geologist or geotechnical engineer covering slope stability, foundation conditions, springs and surface hazards. The fault-rupture zone runs 500 feet on the downthrown side and 250 feet on the upthrown side of a mapped fault line. Building in the zone also means signing a geologic hazard disclaimer and recording a notice of hazard on the plat. High-category rockfall areas go to the Hillside Review Board.
  • Adverse construction conditions: expansive soil and rock, collapsible soil, gypsiferous soil and rock, shallow bedrock, caliche, wind-blown sand, breccia pipes and paleokarst, soil piping and erosion, and shallow ground water. Development in these mapped areas needs a site-specific report from a licensed geotechnical engineer with design mitigations. If the city engineer finds the report inadequate, the application is denied.

For new homes, the city's Verification of Geotechnical Services form asks the soils engineer to state whether expansive or collapsible soils were found on the lot. It also has the engineer agree to check the foundation subgrade and provide a stamped compliance report. A retaining wall 4 feet or taller brings extra site design requirements before the permit is issued. The residential final inspection checklist includes a compliance letter from the soils company and an engineering letter for any rock retaining wall or rock-faced slope.

If you're building or adding on, ask your contractor which geotechnical firm is on the job and whether its report covers the addition.

Hillside lots

The Hillside Development Overlay Zone in City Code 10-13A limits how much of a hillside can be disturbed:

  • Natural slopes of 20% or less follow the underlying zone.
  • On slopes of 21% to 30%, no more than 30% of that slope area may be disturbed. On 31% to 40%, no more than 5%. Slopes over 40% may not be disturbed.
  • Developing on slopes of 21% or more, or in a high-category rockfall area, needs an HDOZ permit. The application goes to the Planning Commission first, and the City Council gives final approval.
  • Hillside cuts or fills may not exceed 10 feet, or 20 feet combined.
  • Homes must sit on the flattest part of the parcel and may not extend over a natural ridgeline. Setbacks from unmapped ridgelines are at least 30 feet, 50 feet on plateaus and 100 feet on a cuesta, or more if the geotechnical report says so. Exterior colors must be earth tones, and retaining walls must be colored to blend with the surrounding rock.

Landmark sites

Under City Code 10-13E-4, a property owner can ask the City Council to designate a building at least 100 years old as a landmark site. Exterior work that materially changes a landmark site needs a permit from the City Council, after a recommendation from the Historic Preservation Commission. A landmark structure can't be demolished unless it poses an immediate hazard.

Doing the work yourself

Utah Code 58-55-305(1)(d) exempts a sole owner building a home on their own property for noncommercial use, limited to one residential structure a year and three in five years. A shed, carport or detached garage that goes with the house is also covered. St. George's Owner/Builder Certification is signed under penalty of perjury before a notary, for new homes and for remodels or additions. On it, you confirm the work will be done by you, a licensed contractor, your own employees covered by workers' comp, or helpers paid nothing beyond token compensation. The form warns that paying an unlicensed person for work that needs a license is a Class A misdemeanor, with fines of up to $2,000 a day.

Check the contractor

Look up the license on DOPL's public license search. Small repair and remodel jobs under $7,000 may fall under the handyman exemption, but plumbing and electrical work on those jobs still needs licensed trades (Utah Code 58-55-305(1)(h)). The Utah licensing guide explains the classifications.

Before you sign

  • Get the DOPL license number and look it up.
  • Ask whether the lot is in a mapped hazard or hillside area and who is writing the geotechnical report.
  • Confirm who pulls the permit in CityInspect and who schedules inspections.
  • Keep lien waivers from subcontractors and suppliers before final payment (Utah mechanics' lien law).

The hiring checklist and Utah permit guide cover each step. Nearby, see Washington, Hurricane and Cedar City, or all of Washington County. Browse St. George plumbers, electricians, HVAC contractors, roofers, concrete contractors, landscapers and remodelers.

Sources

Frequently asked questions

How do I apply for a building permit in St. George?

Online, through the city's CityInspect portal at stg.cityinspect.com. You register once and can use the same login for other Utah cities on CityInspect. The Building Department is at 61 S Main St and answers at 435-627-4100.

Do I need a permit for a fence in St. George?

Yes. The city's code enforcement FAQ says a permit is required to install a fence or wall, with the rules in City Code 10-18-1.

Why does my St. George lot need a soils report?

City Code 10-13B adopts the Utah Geological Survey hazard maps for the St. George area. Development in an area mapped for expansive, collapsible or gypsiferous soil, shallow bedrock, caliche, wind-blown sand, soil piping or shallow ground water needs a site-specific report from a licensed geotechnical engineer, and the work has to follow its recommendations.

Can I build my own house in St. George?

Utah Code 58-55-305(1)(d) lets a sole owner build one residential structure a year, and no more than three in five years, for personal use without a contractor license. St. George asks owner-builders to sign a notarized Owner/Builder Certification. Anyone you pay to work on the job, other than your own employees or helpers paid only token compensation, must be licensed.