Quick answer
Cedar City's Building and Zoning office (435-865-4519, 10 N. Main St.) takes permits through CityInspect. A residential submittal includes stamped structural plans, a geotechnical datasheet and a prairie dog clearance. Basement finishes, remodels, solar, mechanical equipment replacements, retaining walls over 4 feet and accessory buildings over 200 sq ft need permits; fences 6 feet or less and non-structural flatwork don't. A bond is required before construction begins.
Cedar City's Building and Zoning office handles permits for the city, and its residential submittal list includes two items that can hold up a start date: a geotechnical datasheet and a prairie dog clearance.
Who to call
From the city's Building and Zoning page:
- Main phone: (435) 865-4519
- Address: 10 N. Main St., Cedar City, UT 84720
- Hours: 8 a.m. to 5 p.m.
- Permit Technician: Hope LaCagnina, [email protected]
- City Planner: Donald Boudreau, 435-383-2330
- Applications and inspections: CityInspect. New accounts register through the city's CityInspect sign-up.
What needs a permit
Cedar City's FAQ (When is a Building Permit required?) says a permit is generally needed for changes to the structure, electrical, plumbing or mechanical systems, or to walls or floors. It lists:
- accessory structures over 200 square feet, or with more than one story, footings, foundations or utility hookups
- remodels and basement finishes
- solar PV installs
- mechanical equipment replacements
- meter work
- retaining walls over 4 feet, which also need engineered plans
- changes of occupancy, commercial renovations and new buildings
No permit needed:
- non-structural concrete flatwork
- a fence 6 feet or less (taller needs a consultation with Building and Zoning; a front-setback fence must be 1 foot off the sidewalk and no more than 30 inches high)
Accessory buildings depend on several factors. The city points you to City Ordinance Chapter 26, Article 3, for your zone, or to 435-865-4519. The FAQ also notes that insurers may deny claims for unpermitted work that doesn't meet code.
Bond before you build
The FAQ says the property owner or contractor must post a bond before construction begins (cash, letter of credit or surety bond). After completion, a warranty bond of 10% or $400, whichever is greater, is held for 12 months. Settle in the contract who posts it and who gets it back.
Residential submittal
The Building and Zoning page lists, for a home:
- the actual property address on every document
- one PDF plan set, with architectural plans separate from site and structural plans
- stamped structural plans and a site plan
- a geotechnical datasheet
- a prairie dog clearance request
- signed energy code compliance documents
- water acquisition or impact fee documents, when they apply
- an owner-builder affidavit, if you're the builder
Inspections need at least one business day's notice through the portal, and the water meter sign-off must happen before the final building inspection.
Design values
From the Building Design Standards page:
- Ground snow load: from the USU Utah snow load map; roof snow load per the design professional
- Wind: 90 mph with 115 mph gust, Exposure B
- Seismic: D1
- Frost depth: 30 inches
- Floodplain: use the city's GIS map. A property in the 100-year floodplain needs a Flood Elevation Certificate completed by a land surveyor, engineer or architect.
The Utah seismic and snow load guide explains the state amendments behind these.
Doing the work yourself
Cedar City accepts an Owner-Builder Certification with the submittal. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a contractor license. Anyone you pay who isn't your employee needs the license the work requires.
Check the contractor
Look up the business on the DOPL license lookup. The licensing guide explains the classifications, and the handyman exemption covers small jobs.
Before you sign
- Check the license and the classification.
- Agree on who posts the construction bond and the warranty bond.
- On a new home, confirm the geotechnical datasheet and prairie dog clearance are filed.
- Check the floodplain map before you buy a lot or plan an addition.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. To the south, see St. George and Hurricane, or all of Iron County. Browse Cedar City remodelers, concrete contractors, fence builders, HVAC contractors, plumbers and electricians, or get quotes.
Sources
- Cedar City, Building & Zoning: contacts, CityInspect, submittal list, inspections.
- Cedar City, FAQ: When is a Building Permit required?: permit list, fences, retaining walls, bonds.
- Cedar City, Building Design Standards: design values, floodplain.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
Do I need a permit to finish my basement in Cedar City?
Yes. Cedar City's building FAQ says a permit is required to finish a basement, and also to remodel a house.
Do I need a permit for a fence in Cedar City?
Not for a fence 6 feet or less in height. A fence taller than 6 feet requires a consultation with Building and Zoning. In the front setback, a fence must be 1 foot off the sidewalk and no more than 30 inches high.
Why does Cedar City ask for a prairie dog clearance?
The city's residential permit submittal list includes a prairie dog clearance along with the geotechnical datasheet and energy code documents. The request form is on the Building and Zoning page.
Is a bond required with a Cedar City building permit?
Yes. The property owner or contractor must provide a bond before construction begins, by cash, letter of credit or surety bond. After completion, a warranty bond of 10% or $400, whichever is greater, is held for a 12-month warranty period.