Utah Contractors

Popular Searches

Browse Directory

Contractors in West Jordan, Utah

Salt Lake County • Population: 116,812

Showing 0 verified contractors

No contractors found in West Jordan yet

Check back soon or browse other cities.

Quick answer

West Jordan's Building and Safety Division takes permit applications online through the West Jordan Public Portal and reviews residential projects within 10 business days. A shed or other accessory building needs a permit if it is over 200 square feet, 17 feet or taller, or has water, power or gas. Water heater, furnace, AC and electrical service permits may not need plans. Call 801-569-5050 with questions.

West Jordan's Building and Safety Division handles plan review, permits and inspections for new homes, additions, remodels and demolitions. It is at City Hall, 8000 South Redwood Road, and the Permit Center is generally open 8 a.m. to 5 p.m., Monday through Friday. Permits, inspections and code questions go to 801-569-5050 (Building and Safety).

Applying online

Every permit starts in the West Jordan Public Portal, the city's Cityworks portal. Register or sign in, start a "Building & Safety" application, pick the category that fits, and upload plans. From the city's portal guide and online submittal instructions:

  • Plans go in as PDFs, except small miscellaneous residential projects, which can be photos.
  • Electrical service upgrades, water heater and furnace or AC permits may not need plans.
  • First review of a residential project takes up to 10 business days; corrections and revisions are usually reviewed within 5.
  • Once approved, the city emails the fee invoice. After you pay, it emails the permit, and you keep a printed copy of the permit and plans on site for inspections.

Residential permits also need a site plan in the city's format, with setbacks, easements, driveway width (18 to 30 feet) and drainage arrows that match the lot's grading plan (residential site plan checklist).

Inspections

Inspections are booked in the portal under "Schedule Inspection"; you need an active account and must be listed as a point of contact. Footing and foundation inspections are timed, and other inspections let you pick morning or afternoon. Call the office after 8 a.m. on the day to confirm a meeting time.

For an electrical service upgrade, book the power-to-panel inspection for the same day as the Rocky Mountain Power shut-off, then call the main office when the work is done; the guide says an inspector should arrive within an hour. Ask your electrician how they plan to coordinate the two.

Sheds, garages and other accessory buildings

The city's accessory structure brochure requires a building permit when a structure:

  • is over 200 square feet, or
  • is 17 feet or taller, or
  • has water, power or gas connected.

Zoning rules apply either way. In residential zones an accessory building is capped at 20 feet tall, can't sit in the front yard, must be smaller than the house, and can't be built over a platted easement unless an easement release is recorded with the Salt Lake County Recorder. Permitted structures sit at least 6 feet from the house and 3 feet from rear and side lot lines in the rear yard. Planning and Zoning answers these questions at 801-569-5060.

Basement finishes

A basement finish needs a permit. The city's basement finish guide (updated January 28, 2025) lists what to submit and the common code items inspectors check:

  • Total square footage and the use of each room
  • A minimum 7-foot ceiling, with no light fixtures or other projections below it
  • Egress windows in bedrooms; window wells 36 inches deep from the window, and a fixed ladder in wells deeper than 44 inches
  • R-13 insulation on exterior walls
  • Tamper-resistant receptacles and a dedicated 20-amp GFCI circuit for the bathroom
  • Interconnected, battery-backed smoke detectors in every bedroom and the hallway outside, and a carbon monoxide detector on each floor
  • An electrical panel that is not in a closet or bathroom

If a contractor's basement bid leaves out egress windows for a planned bedroom, ask why.

Codes, snow and flood zones

The city's codes and design criteria apply the 2021 International Residential Code with Utah amendments, seismic design category D2 for homes, and a 30-inch frost depth. Residential ground snow loads come from Utah State University's snow-load site. Homes in FEMA flood zones A or V must meet IRC section R322. See Utah building code, seismic and snow loads for the state rules. Excavation and land disturbance permits are handled by Engineering at 801-569-5133.

Doing the work yourself

Utah law lets a sole property owner build without a contractor license under Utah Code 58-55-305(1)(d): no more than one home a year and three in five years, for your own noncommercial use, plus sheds, carports and detached garages on that property. Anyone you pay more than token compensation must be licensed if the work requires it.

Check the contractor

Look up the license on DOPL's license search. Jobs under $7,000 can fall under the handyman exemption in Utah Code 58-55-305(1)(h), but plumbing and electrical work still needs licensed trades and HVAC work a licensed HVAC contractor. The Utah licensing guide has the classifications.

Before you sign

  • Confirm the license number and classification.
  • Ask who will apply in the portal and who is listed as the point of contact for inspections.
  • For a shed or garage, confirm the size, height and setbacks against the brochure.
  • Review Utah lien law and collect lien waivers before final payment.

The hiring checklist and Utah building permit requirements cover each step. Nearby, see South Jordan and West Valley City, or all of Salt Lake County. Browse West Jordan plumbers, electricians, HVAC contractors, roofers, window and door installers and remodelers.

Sources

Frequently asked questions

Do I need a permit for a shed in West Jordan?

You need a building permit if the shed is over 200 square feet, 17 feet or taller, or has water, power or gas connected. Smaller sheds still have to meet the city's zoning rules on placement and setbacks.

How long does a West Jordan residential permit take?

The city's portal guide allows up to 10 business days, excluding holidays, for the first review of a residential project. Corrections are reviewed within 5 business days.

How do I schedule an inspection in West Jordan?

Sign in to the West Jordan Public Portal and choose Schedule Inspection. You must have an active account and be listed as a point of contact on the permit.

Does a water heater or furnace replacement need plans in West Jordan?

The city's online submittal instructions say electrical service upgrades, water heater and furnace or AC permits may not need plans. You still apply for the permit through the portal.

Directory last updated: November 23, 2026 ยท All contractors verified by Utah DOPL