This checklist follows a home project from the first phone call to the final payment. Each step links to the Utah law behind it. Utah licenses contractors through the Division of Professional Licensing (DOPL), and its lien law gives you strong protection if you hire a licensed contractor and pay under a written contract. Most of the steps below exist to keep that protection in place.

Step 1: Decide what you're hiring for

Write the job down before you call anyone: rooms, measurements, the materials you want, and what you'll handle yourself. Bids are only comparable when every contractor prices the same job.

Then figure out which license the job needs. Utah issues licenses by classification (Utah Admin. Code R156-55a-301):

  • An addition or whole-house remodel: B100 General Building or R100 Residential and Small Commercial.
  • A non-structural remodel up to $50,000: R101.
  • A roof: S280. Siding, gutters and windows: S230. Paint and drywall: S270. Concrete: S260. Landscaping: S330.
  • Wiring: E200 or E201. Plumbing: P200 or P201. Furnace, AC or heat pump: H100.
  • Pest control: a Utah Department of Agriculture and Food Commercial Pesticide Business License.

A general contractor hires licensed electrical, plumbing and HVAC subcontractors for those parts of the job (Utah Code 58-55-102(26) and (42)). Check what the job typically costs so you can spot a bid that's far off.

Step 2: Get at least three written bids

Ask each contractor for the scope, materials, price, payment schedule and timeline in writing. A much lower bid usually leaves something out: tear-off, permits, disposal or a cheaper material. Ask each bidder how they priced those items.

The contractor's license number belongs on the bid. Utah Code 58-55-304(2) requires it on permit applications, contracts, agreements and bids whenever a license is required. A bid without one is a reason to ask.

Step 3: Check the license

Every contractor doing licensed work must hold a DOPL license before starting (Utah Code 58-55-301).

  • Search the business on DOPL's license lookup by name and profession, or by license number.
  • Confirm the status is active. "Active on Probation" means DOPL has disciplined the license; ask about it.
  • Check the classification against Step 1. A specialty contractor must stay inside its scope (R156-55a-301am).
  • Make sure the name on the license matches the name on the bid. Doing business under another name is unlawful conduct (58-55-501(11)).

Small jobs

A repair or remodel under $7,000, counting labor, materials and change orders, can be done by an unlicensed handyman (58-55-305(1)(h)). The plumbing, electrical, HVAC and radon parts of that job still need licensed trades. A handyman on a job over $3,000 must have filed an insurance affirmation with DOPL. See the handyman exemption.

Step 4: Ask for insurance and references

A licensed contractor must carry liability insurance of at least $1,000,000 per incident and $2,000,000 total, covering its scope of work, and either workers' compensation or a Utah Labor Commission waiver (R156-55a-302d). Ask for a current certificate of insurance and call the agent on it to confirm the policy is in force. A licensee must give proof of insurance within 30 days to anyone with a reasonable basis to make a claim (R156-55a-501(4)). More on insurance requirements.

If the certificate shows no workers' compensation, ask whether the contractor has employees. A waiver is only for a business with no workers besides the owner.

Ask for three recent references for similar work, and call them. Ask whether the job finished on budget, how change orders were handled, and whether they'd hire the contractor again.

Step 5: Watch for red flags

  • Door-to-door offers after a hailstorm or windstorm, especially from out-of-state trucks.
  • Pressure to sign today, or a price that's only good right now.
  • A large cash deposit, or cash only.
  • An offer to skip the permit, or to have you pull an owner-builder permit for work the contractor is doing. Applying for a permit on behalf of an unlicensed person is unlawful conduct (58-55-501(6)).
  • A $7,000-plus job split into smaller invoices. The exemption counts the whole contracted value, including changes.
  • No license number, or a number that belongs to a different business.
  • A handyman who calls himself a contractor, plumber or electrician. DOPL's handyman form says those words are off-limits to an exempt handyman (DOPL form).

Step 6: Get the contract in writing

A written contract does two jobs in Utah: it sets the terms, and it's one of the conditions for your lien protection (Utah Code 38-11-204(4)). DOPL's rule defines the written contract as documents that show the offer, your acceptance before work starts, the residence, the parties, the work and the price (R156-38a-102(15)).

Put these in the contract:

  • The contractor's legal name, any DBA, address and license number.
  • The "Protection Against Liens and Civil Action" notice. Every contract between an original contractor and a homeowner must include it (R156-38a-108), and leaving it out is unlawful conduct (58-55-501(18)).
  • A detailed scope of work, with brands, models and materials.
  • The price, and how change orders are priced and approved: in writing, signed by both of you, before the work.
  • A payment schedule tied to finished stages of work.
  • Start and completion dates.
  • Who pulls and pays for the permits.
  • Cleanup, disposal, and the warranty on labor and materials.

DOPL publishes an optional Residential Construction Agreement (May 29, 2025 version) with a change order form and a proof-of-license-and-insurance exhibit. You don't have to use it, but it's a useful checklist. See contract requirements.

Step 7: Know your right to cancel

If you signed at your home, the federal FTC Cooling-Off Rule gives you three business days to cancel many sales of $25 or more. Utah's home solicitation law gives the same window for consumer credit sales made at your home (Utah Code 70C-5-102). Neither covers work you asked for to meet an emergency. Cancel in writing and keep proof of the mailing date. See cancelling a home solicitation sale.

Step 8: Keep the deposit small and pay as work is done

A modest deposit for ordered materials is normal. Paying most of the price before work starts leaves you with no leverage. Tie each payment to work you can see, and pay by check or card so there's a record.

A contractor who takes your money for a project and then doesn't pay the subs and suppliers on it commits unlawful conduct, and doing it with intent to keep the money is theft (58-55-501(13), 58-55-503(3)). Contractors must pay subs within 30 days of receiving funds for billed work unless the contract says otherwise (58-55-603).

Step 9: Make sure the permits are pulled

Most structural, electrical, plumbing and mechanical work needs a permit and inspections from your city or county building department. Failing to get a required permit is unlawful conduct for a contractor (58-55-501(7)), and an unlicensed person can't legally obtain one (58-55-501(4)). Ask to see the permit before work starts and keep the inspection records. Building permits in Utah explains who issues what, and seismic and snow loads covers the structural rules for roofs, additions and solar.

Step 10: Protect yourself from liens

Anyone who supplies labor or materials and isn't paid can claim a lien. Utah gives you a way out for an owner-occupied home (a single-family house or duplex you or your tenant live in). Under Utah Code 38-11-107, a sub or supplier can't maintain a lien or win a judgment against you if:

  • you signed a written contract with a contractor who was licensed or exempt on the day you signed, and
  • you paid that contractor in full under the contract and its amendments.

On a general contract of $5,000 or less, subs and suppliers are barred from a lien on your home whether or not the contractor was licensed (38-11-107(1)(b)). If a lien is filed anyway, you can apply to DOPL for a certificate of compliance that proves your protection (38-11-110).

A lien claimant must record a notice of construction lien within 180 days after final completion of the original contract, or 90 days after a notice of completion is filed (38-1a-502). Lien waivers from subs as you pay add a second layer. More in Utah's lien law.

Step 11: During the project

Keep a file: the contract, change orders, receipts, permits, inspection reports and photos at each stage. Put decisions in email or text so there's a record. If the house was built before 1978 and the work disturbs paint, confirm the firm is certified by Utah's Lead-Based Paint Program (lead-safe renovation).

Step 12: Finishing up

Walk the job with the contractor and write a punch list. Hold the final payment until the list is done and the final inspection has passed. Then pay in full under the contract, and keep proof: your lien protection depends on it. Get the warranty, manuals and paint colors in writing.

If something goes wrong

When you're ready to compare contractors, get quotes from licensed pros in your area, or browse roofers, plumbers, electricians and remodelers.

Sources

Frequently Asked Questions

What should I check before hiring a contractor in Utah?

Search the business on DOPL's license lookup (secure.utah.gov/llv/search/index.html) or call DOPL at (801) 530-6628. Confirm the license is active, the name matches your bid, and the classification covers the work: for example S280 for a roof or E200/E201 for wiring. Then ask for a current certificate of liability insurance and call the agent.

What must a Utah contractor put in my contract?

The contractor's license number (Utah Code 58-55-304(2)) and a notice titled 'Protection Against Liens and Civil Action' that explains how you're protected from subcontractor liens (Utah Code 38-11-108; Utah Admin. Code R156-38a-108). Leaving the notice out is unlawful conduct under 58-55-501(18).

How do I protect my Utah home from a subcontractor's lien?

Sign a written contract with a contractor who is licensed (or exempt) on the day you sign, and pay that contractor in full under the contract. Under Utah Code 38-11-107 and 38-11-204, an unpaid sub or supplier then can't maintain a lien on your owner-occupied home. On a general contract of $5,000 or less, subs are barred from a lien whether or not the contractor was licensed.

Can I cancel a contract I signed at home in Utah?

Often. The FTC Cooling-Off Rule gives you three business days to cancel many sales of $25 or more made at your home. Utah's home solicitation law gives the same three business days for consumer credit sales made at your home (Utah Code 70C-5-102). Neither covers emergency repairs you asked for. Cancel in writing.