Sanding, scraping, cutting or demolishing painted surfaces in an older home can release lead dust. The federal Renovation, Repair and Painting (RRP) rule controls how paid contractors do that work. In Utah, the rule is run by the state: EPA has authorized Utah to operate its own program, and the Utah Division of Air Quality (DAQ), part of the Department of Environmental Quality, certifies the firms.

Who runs the program in Utah

EPA's RRP program page lists Utah among the states EPA "has authorized ... to operate their own programs." In those states, firms apply to the state program instead of EPA.

Utah's program is the DAQ Lead-Based Paint Program. Its rules are in the Utah Administrative Code:

  • R307-840: purpose, applicability and definitions
  • R307-841: residential property and child-occupied facility renovation (the RRP rule)
  • R307-842: lead-based paint activities such as inspection, risk assessment and abatement

Under R307-841-2, firm and renovator certification has been required in Utah since April 8, 2010, and work practice standards since July 5, 2012.

What the rule covers

The rule applies to all renovations performed for compensation in target housing and child-occupied facilities (R307-841-3).

  • Target housing is housing built before 1978, except housing for the elderly or people with disabilities (unless a child 6 or under lives or is expected to live there) and 0-bedroom dwellings (R307-840-2).
  • Renovation means modifying an existing structure in a way that disturbs painted surfaces. It includes removing or repairing painted components, window repair, surface prep like sanding and scraping, removing building components such as walls, ceilings, plumbing and windows, and weatherization work such as cutting holes for blown-in insulation (R307-840-2).

That reaches well beyond painters. Window installers, electricians cutting into plaster, plumbers opening walls, HVAC crews and remodelers are all covered when they disturb paint in a pre-1978 home.

DAQ's page says homes built before 1978 likely contain lead-based paint, and it links a map for checking a home's construction date.

The minor repair exemption

Minor repair and maintenance isn't renovation. It covers activities, including minor HVAC, electrical and plumbing work, that disturb 6 square feet or less of painted surface per room inside, or 20 square feet or less outside, as long as (R307-840-2):

  • no prohibited or restricted work practice is used
  • the work doesn't involve window replacement or demolition of painted surfaces

Jobs in the same room within 30 days count as one job. A contractor can't split a project into small visits to stay under the limit.

When testing shows no lead

The rule doesn't apply where the components affected are shown to be free of lead-based paint (at or above 1.0 mg/cmยฒ or 0.5% by weight) by (R307-841-3(1)):

  • a written determination by a certified inspector or risk assessor
  • a certified renovator using an EPA-recognized test kit on each affected component
  • a certified renovator collecting paint chip samples analyzed by an EPA-recognized laboratory

Ask to see the written result. The firm must keep it.

Emergencies

Emergency renovations, unplanned work after a sudden event like an equipment failure that would otherwise cause a safety hazard or significant damage, are exempt from the pamphlet requirement and, to the extent necessary, from signs, containment, waste handling and certification. They are not exempt from the cleaning requirements (R307-841-3(2)).

Doing it yourself

Utah's rule covers renovations performed for compensation. EPA notes the RRP rule generally doesn't apply to homeowners working on their own home, but does if they rent all or part of it, run a child care center there, or flip houses. The dust is just as hazardous when you make it yourself, so use the same precautions.

What the contractor must do

Firm and renovator certification

  • Firms that perform renovations for compensation must be certified by the Utah DAQ director. Certification lasts up to five years (R307-841-7). DAQ's page says firms apply through its ATLAS database.
  • Renovations must be performed by certified firms using certified renovators. A renovator must complete an accredited initial course and keep it current with refreshers (R307-841-8).
  • The certified renovator must train the other workers on the job, be on site when warning signs are posted, when containment is set up and during cleaning, and be available on site or by phone the rest of the time (R307-841-8(2)).

DAQ publishes a list of certified firms on its program page.

The pamphlet

No more than 60 days before starting work in a pre-1978 home, the firm must give the owner the Renovate Right pamphlet and either get a written acknowledgment or obtain a certificate of mailing at least 7 days before work starts. If the owner doesn't live there, the firm must also give the pamphlet to an adult occupant (R307-841-4). EPA's current version is linked from the DAQ page.

Work practices

Under R307-841-5, the firm must:

  • post warning signs defining the work area, in the occupants' primary language where practicable
  • contain the work area: inside, remove or cover furniture, seal ducts, cover doors and lay taped-down plastic at least 6 feet beyond the work; outside, close doors and windows within 20 feet and cover the ground 10 feet beyond the work
  • contain waste and store it securely at the end of each day
  • clean thoroughly and do cleaning verification

These practices are prohibited or restricted:

  • open-flame burning or torching of painted surfaces: prohibited
  • high-speed sanding, grinding, planing, needle guns or abrasive blasting on painted surfaces: prohibited unless the machine has a shroud or containment and a HEPA vacuum attachment
  • heat guns: allowed only below 1,100ยฐF

Records

The firm must keep records showing compliance, including test results, your signed pamphlet acknowledgment and documentation of the work practices, for 3 years after the job and make them available to the DAQ director (R307-841-6). You can ask for a copy.

How this fits with DOPL licensing

Lead-safe certification from DAQ is separate from a DOPL contractor license. A painter, window company or remodeler working on a pre-1978 home needs both: the right DOPL classification (for example, S270 drywall, paint and plastering on DOPL's application) and DAQ firm certification. See the Utah licensing guide and Construction Trades Licensing Act.

Questions to ask before you hire

  1. Is your firm certified by the Utah Division of Air Quality? What's the certification number?
  2. Who is the certified renovator on my job, and when will they be on site?
  3. Will you test the painted surfaces first? Can I see the results?
  4. How will you contain dust, and what does cleanup verification involve?
  5. Will I get the Renovate Right pamphlet and a copy of the records?

Questions about Utah's program go to DAQ at (801) 536-4000. Find painters and remodelers, compare painting costs in Utah, and use the hiring checklist.

Sources

Frequently Asked Questions

Who certifies lead-safe renovation firms in Utah, EPA or the state?

The state. EPA lists Utah among the states authorized to operate their own RRP programs, and the Utah Division of Air Quality's Lead-Based Paint Program certifies renovation firms and renovators under Utah Admin. Code R307-841. A firm working on pre-1978 Utah homes applies to the Division, not EPA.

Does lead paint matter for my Utah remodel?

If your home was built before 1978 and the contractor will disturb painted surfaces beyond the minor repair limits (6 square feet per room inside, 20 square feet outside, no window replacement or demolition), the firm must be certified by the Utah Division of Air Quality and follow lead-safe practices, unless a certified inspector, risk assessor or renovator determines the affected components are lead-free (R307-840-2 and R307-841-3).

Do the RRP rules apply if I do the work myself?

Utah's rule applies to renovations performed for compensation (R307-841-3). EPA says the rule generally doesn't apply to homeowners working on their own homes unless they rent the home out, run a child care center there, or flip houses. The dust hazard is the same either way.

What pamphlet should a Utah contractor give me before working on an older home?

No more than 60 days before starting work in pre-1978 housing, the firm must give the owner the EPA 'Renovate Right' pamphlet and get a signed acknowledgment, or a certificate of mailing at least 7 days before work starts (Utah Admin. Code R307-841-4).