No contractors found in Murray yet
Check back soon or browse other cities.
Quick answer
Murray's Building Division (801-270-2431, [email protected]) takes building permit applications online through eProcess 360. Before a remodel or addition permit is issued, the city wants the name and state license number of the general, electrical, plumbing and mechanical contractor. Fences 7 feet and taller need a building permit, and every fence needs Planning and Zoning approval.
Murray's Building Division sits in City Hall at 10 E 4800 S, Suite 260, and handles building permits for homes inside city limits. Its checklists are the clearest guide to what the city wants, and one rule shows up on every residential checklist: the contractors' state license numbers have to be on file before a permit is issued.
Who to call
From the city's Building Inspection page:
- Building Division: (801) 270-2431, [email protected]
- Hours: Monday through Friday, 8 a.m. to 5 p.m.
- Applications: online through eProcess 360
- Planning and Zoning (second kitchens, ADUs, fences): 801-270-2430, [email protected]
The city takes credit card payments up to $5,000. Anything larger is paid by check in person at City Hall.
What the city asks for
Murray doesn't publish a single list of permit-required work on its Building page; it sends questions to the office. Its project checklists do show where the lines fall:
- Remodels and additions. The Residential Remodel/Addition checklist (updated September 2024) requires the name, phone, address and state license number of the general, electrical, plumbing and mechanical contractors before the permit is issued. Adding a kitchen needs a Second Kitchen Covenant or ADU approval from Planning and Zoning first.
- Fences. The Miscellaneous Plan Submittal checklist (updated January 2026) says all fences need Planning and Zoning approval. A fence 7 feet or taller needs a building permit. A fence 8 feet or taller needs engineered plans.
- Roof conversions need framing details, rafter size and spacing, sheathing and roofing material on the plans.
- Swimming pools need a site plan, structural details, an electrical plan, a gas line diagram and a 6-foot fence with a self-closing gate. Heated pools need a cover, and the pump needs a time clock.
- Basements, detached garages and demolition each have their own checklist on the city's Plan Submittals page.
A city checklist says what the plan reviewer will look for. If a contractor tells you a job "doesn't need a permit," call (801) 270-2431 and ask before work starts.
Codes in effect
The Building page says Utah's updated codes took effect July 1, 2026: the 2024 IBC, IPC, IMC, IEBC and IECC as amended by Utah, and the 2023 NEC. Homes still fall under the 2021 IRC. An application filed before July 1, 2026 may be reviewed under the codes in effect when it was filed. The Utah seismic and snow load guide covers the state amendments.
Inspections
Permits issued through eProcess 360 carry a number starting with "E." You schedule those inspections yourself online; the city's staff do not book them for you. For an older seven-digit permit, call (801) 270-2431 and leave a message. Ask your contractor which system the permit is in, and who is booking inspections.
Doing the work yourself
The Building page links the state Owner Builder Certification form. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a contractor license. Anyone you pay who isn't your employee must hold the license the work requires. Electrical, plumbing and HVAC work by a hired person always needs a licensed trade contractor. The handyman exemption page explains the $7,000 limit for small jobs.
Check the contractor
Murray asks for license numbers, so get them early. Look each one up on the DOPL license lookup and match the classification to the work. The Utah licensing guide lists the classifications.
Before you sign
- Get the general and trade contractors' license numbers and look them up.
- Ask which permits the job needs and who will pull them in eProcess 360.
- Check Planning and Zoning first for fences, second kitchens and ADUs.
- Agree on who schedules inspections.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step, and the permit requirements page explains the state rules. Nearby, see Midvale and Taylorsville, or all of Salt Lake County. Browse Murray plumbers, electricians, HVAC contractors, roofers, fence builders and remodelers, or get quotes.
Sources
- Murray City, Building Inspection: contacts, eProcess 360, inspections, code adoption, payments.
- Murray City, Residential Remodel/Addition checklist (9/16/24): contractor license numbers, second kitchens.
- Murray City, Miscellaneous Plan Submittal checklist (1/9/26): fences, pools, roof conversions.
- Utah Code 58-55-305: licensing exemptions, including owner-builders. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
How do I apply for a building permit in Murray?
Apply online through eProcess 360 at murray.ut.eprocess360.com. The city will not accept an application for plan review until the submittal is complete. Questions go to the Building Division at (801) 270-2431 or [email protected].
Do I need a permit for a fence in Murray?
Murray's submittal checklist says all fences need Planning and Zoning approval. A fence 7 feet or taller also needs a building permit, and a fence 8 feet or taller needs engineered plans. A fence under 7 feet does not need a building permit.
How do I schedule an inspection in Murray?
For permits numbered with an E from eProcess 360, you schedule the inspection yourself online in that system. For older seven-digit permits, call (801) 270-2431 and leave a message.