Contractors in Park City, Utah

Summit County • Population: 8,587

Showing 0 verified contractors

No contractors found in Park City yet

Check back soon or browse other cities.

Quick answer

Inside Park City limits, the Building Department (435-615-5101) requires a permit for all but finish work like paint and cabinets, and any drywall work generally needs one. Work in the Historic District needs Planning review first. Remodels valued over $50,000 fall under the city's wildland-urban interface code, and properties in the Soil Ordinance boundary must meet soil cover rules for historic mill tailings. Snyderville Basin addresses outside city limits go to Summit County.

A Park City mailing address covers more ground than Park City itself. Inside city limits, the Park City Building Department's process has extra layers for the Historic District, wildfire, mine-era soils and registered HOAs. Outside the limits, in the Snyderville Basin, Summit County handles permits.

City or county first

Park City links a municipal boundary map from its permit page. Check it before you hire anyone.

  • Inside city limits: Park City Building Department, 445 Marsac Avenue, 435-615-5101, [email protected]. Applications go through City Inspect.
  • Outside city limits, such as the Snyderville Basin: Summit County Building, 60 North Main Street, Coalville, 435-336-3124, [email protected], Monday through Friday 8 a.m. to 5 p.m. The county takes permits only through eProcess 360 (no paper plans or over-the-counter review). It exempts residential accessory buildings under 200 sq ft, certain agricultural buildings, and fences under 7 feet.

The rest of this page covers the city.

When the city requires a permit

From Park City's Building Permit FAQs:

  • You need a permit unless the work is exempt under IBC Section 105.2.
  • Carpet, paint, wallpaper, cabinets and countertops are exempt.
  • Any drywall work generally requires a permit.

Fees are based on the total valuation of materials and labor, and impact fees are added where they apply.

How a permit moves

  1. Start the application in City Inspect and upload the documents for your permit type, scope and location.
  2. The city checks the submittal for completeness, then assigns reviews (building, fire safety, community code compliance, engineering, planning).
  3. Pay the fees through the Finance Department and send proof to the Building Department.
  4. Print the approved plans and permit from City Inspect.
  5. Complete the deferred items listed on the conditional approval form, then schedule a Limits of Disturbance (LOD) inspection and a pre-construction meeting at 435-615-5101. Construction can begin after the LOD inspection passes.

Historic District

The Planning Department handles Historic District Design Review:

  • Most work in the Historic District needs a Historic District Design Review pre-application.
  • Any work that modifies historic material needs a full HDDR application, reviewed by the Historic Preservation Board.
  • Applications are reviewed against the Design Guidelines for Historic Districts and Historic Sites under Land Management Code Chapter 15-13.

Planning approval comes before the building permit. Ask a contractor quoting windows, siding or an addition on a historic home whether the HDDR is in their timeline. Planning is at 435-615-5000.

Wildland-urban interface

Park City's WUI code (Municipal Code 11-21-1, an amended version of the 2006 Utah Wildland-Urban Interface Code) applies to all new construction and additions, and to remodels valued at more than $50,000. The landscape and home hardening plan is reviewed with the building permit. The city's WUI worksheet tells you which requirements apply.

Mine tailings and the Soil Ordinance

The city says some areas have historic mill tailings in the soil with high levels of metals, especially arsenic and lead. Its Soil Cover Ordinance (Municipal Code 11-15) sets topsoil and landscaping requirements inside the Park City Soils Ordinance boundary, which has its own interactive map. Questions go to Ryan Blair, Property and Environmental Services Manager, [email protected]. If your project digs up a yard inside the boundary, the landscaping contractor needs to know.

HOA notification

For any exterior work in a registered HOA, the city requires an HOA notification, submitted with the permit application or after issuance but before the LOD inspection. The city doesn't enforce CC&Rs; the HOA does.

Design values

Park City's 2026 design criteria list 115 mph wind, Seismic Design Category D (residential) or D1 (commercial), a 42ยฐF mean annual temperature, and a ground snow load from the USU Utah snow load map. See the seismic and snow load guide.

Doing the work yourself

Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a contractor license; anyone you pay who isn't your employee needs the license the work requires. The handyman exemption covers small paid jobs.

Check the contractor

Look up the business on the DOPL license lookup and check the classification in the licensing guide.

Before you sign

  • Confirm whether you're in the city or in unincorporated Summit County.
  • In the Historic District, get the HDDR step on the schedule first.
  • On a remodel over $50,000, ask how the WUI hardening plan affects the price.
  • Inside the Soils Ordinance boundary, plan the topsoil and landscaping.
  • File the HOA notification before the LOD inspection.
  • Collect lien waivers before final payment (Utah lien law).

The hiring checklist covers each step. Nearby, see Heber City and Salt Lake City, or all of Summit County. Browse Park City remodelers, roofers, landscapers, windows and doors, HVAC contractors and electricians, or get quotes.

Sources

Frequently asked questions

Do I need a permit for drywall work in Park City?

Generally yes. Park City's permit FAQ says you need a building permit unless the work is exempt under IBC Section 105.2, gives carpet, paint, wallpaper, cabinets and countertops as examples of exempt work, and says any drywall work will generally require a permit.

What does Historic District Design Review cover?

Park City's Planning Department says most work in the Historic District requires a Historic District Design Review pre-application, and any work that modifies historic material requires a full HDDR application reviewed by the Historic Preservation Board, under the Design Guidelines for Historic Districts and Historic Sites.

What is Park City's Soil Ordinance?

Some areas of Park City have historic mill tailings in the soil that may carry high levels of metals, especially arsenic and lead. The Soil Cover Ordinance (Municipal Code 11-15) sets topsoil and landscaping requirements inside the Soils Ordinance boundary, which the city shows on an interactive map.

Who issues permits in the Snyderville Basin?

If the property is outside Park City's municipal boundary, the permit comes from the Summit County Building Department in Coalville (435-336-3124, [email protected]), which takes applications through eProcess 360.