No contractors found in Springville yet
Check back soon or browse other cities.
Quick answer
Springville's Building Division (801-489-2704) requires a permit for a roof, a deck, a garage, and an interior remodel that changes structure or electrical, HVAC or plumbing systems. A shed needs one if it's over 200 sq ft or has power, water or gas run to it. The city's FAQ says starting work without a permit gets a red tag and a doubled permit fee. Solar ties into Springville Power's own customer-owned generation rules.
Springville's Building Division is at 110 S Main St. It runs its own electric utility, Springville Power, which matters if you're adding solar, and its FAQ is blunt about what happens to work that starts before the permit.
Who to call
From the city's Building Division page:
- Phone: 801.489.2704
- Email: [email protected]
- Applications and plans: City Inspect (create an account)
- Canyon properties: Utah County Building Department, 801-851-8343
What needs a permit
The city requires a permit before you enlarge, repair, change, add to or demolish a structure, or install equipment or systems. Its Building FAQ answers the common ones:
- Deck: yes
- Garage: yes
- Roof: yes
- Shed: yes if over 200 sq ft (120 commercial), and yes at any size if power, water or gas is run to it
- Interior remodel: yes if you add or remove structural parts or change electrical, HVAC or plumbing
Exempt work
The city's exempt work list follows IRC R105.2 with local notes:
- one-story sheds and playhouses up to 200 sq ft (under 120 sq ft for nonresidential)
- fences not over 7 feet
- retaining walls not over 4 feet from the bottom of the footing, unless supporting a surcharge
- sidewalks and driveways
- painting, tile, carpet, cabinets, countertops and similar finish work
- prefabricated pools under 24 inches deep
- decks no more than 30 inches above grade, without guardrails, that don't serve a required exit door
- grade-level storage conex boxes under 350 sq ft
- minor electrical and mechanical items such as replacing a breaker in the same location or portable appliances
Stopping a leak is exempt, but if concealed pipe has to be removed and replaced, it's new work that needs a permit. Fence permits have their own city code section.
Start without a permit, pay double
The FAQ says that if unpermitted work comes to the city's attention, an inspector will red-tag it and the work stops until a permit is issued. If you start without a permit, your permit fee is doubled. The city learns about projects by seeing the work or the trucks, or from neighbors.
Review and inspections
- Initial residential plan review takes place within 14 business days. Corrections are usually rechecked within 3 business days.
- A single-family plan review deposit typically runs $800 to $1,100, depending on size (2023 FAQ).
- Inspections are booked through City Inspect or by phone at least 48 hours ahead. No same-day inspections. Under Utah law, inspections happen within three business days of the request; requests from 5 p.m. Friday through Sunday count as received Monday.
- Every sewer lateral inspection requires a water test at inspection.
Solar and Springville Power
Springville runs its own power department. Solar goes through its customer-owned generation rules in addition to the building permit. Ask a solar installer whether they've connected systems to Springville Power before.
Doing the work yourself
Springville posts an Owner-Builder Certification. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for noncommercial use without a license; anyone you pay who isn't your employee needs the license the work requires. See the handyman exemption.
Check the contractor
The city has a Verify Your Contractor page. You can also search the DOPL license lookup directly. The licensing guide lists the classifications.
Before you sign
- Verify the license.
- Confirm the permit is pulled before work starts, so you don't pay double.
- For a shed with power or water, budget for a permit.
- For solar, ask about Springville Power's interconnection steps.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step. Nearby, see Spanish Fork and Provo, or all of Utah County. Browse Springville roofers, electricians, remodelers, fence builders, plumbers and HVAC contractors, or get quotes.
Sources
- Springville City, Building Division: contacts, City Inspect, inspections, links.
- Springville City, Building FAQ (2023): common permits, double fee, review times, deposit, canyon properties.
- Springville City, Work Exempt from Permits (2021 IRC).
- Springville Power, Customer-Owned Generation.
- Utah Code 58-55-305: owner-builder exemption. Title 58, Chapter 55 is renumbered effective January 1, 2027, so this section will carry a new number after that date.
Frequently asked questions
Do I need a permit to replace a roof in Springville?
Yes. Springville's building FAQ answers 'Roof - Yes' to whether a permit is needed.
Do I need a permit for a shed in Springville?
Only if it's larger than 200 square feet (120 for commercial), or if power, water or gas is run to it. With utilities, a permit is required regardless of size.
What happens if work starts without a permit in Springville?
The city's FAQ says an inspector will red-tag the project and work must stop until a permit is issued, and the permit fee is doubled.
Who handles permits for Springville addresses up the canyon?
The city's FAQ sends canyon property to the Utah County Building Department, 51 South University Avenue, Suite 117, Provo, 801-851-8343.