Quick answer
Eagle Mountain requires a permit for nearly all building, electrical, gas, mechanical and plumbing work, including a reroof, a furnace or water heater swap, a panel replacement and an EV charger. Decks need one if attached or 30 inches or more above grade, and retaining walls once they pass 4 feet (2 feet if they hold back a slope or load). Apply on the city's OpenGov portal and request inspections by email. All exterior lighting must be dark-sky compliant before final inspection.
Eagle Mountain's Building Department, at 3267 E Campus Dr, Suite H, reviews plans, issues permits and inspects homes in the city. The city says permits and inspections are required for all new homes, additions and remodels. Its permit handout follows the code's broad rule: a permit for any building, electrical, gas, mechanical or plumbing work unless the code exempts it.
Applying
From the city's Building Department page and Residential Building Permit FAQs:
- Apply on the city's OpenGov permit portal. Upload everything on the project's submittal checklist; incomplete applications are not accepted.
- Plan review typically takes 3 to 7 full business days. Fees are calculated from the project valuation after review, and the city emails the total, including city impact, building and connection fees. Unified Fire Authority impact fees are also required.
- Pay by check or card through the portal or in person. The permit is issued automatically once paid, and work can start after that.
- An application expires if the permit isn't picked up within 180 days. Once active, the permit needs an inspection within 180 days and must show progress.
- Building questions: 801-789-6614 (listed on the city's permit handout) or [email protected].
What needs a permit
The city's What Requires a Building Permit handout lists:
Structural: new homes, additions, garages, carports, porches, balconies, roof structure modifications (re-roof), load-bearing wall changes, foundation work, basement finishing, attic conversions, new rooms, structural repairs, demolition, moving a structure, and converting a garage into living space. Decks need a permit unless they are no more than 30 inches above grade at any point and don't need guardrails (measured 36 inches out from the deck edge, then down to grade). The Building Department page adds that every attached deck needs one.
Mechanical: installing or replacing furnaces, heat pumps and air conditioners; duct systems, exhaust systems and whole-house ventilation; fireplaces and wood stoves; gas appliances, boilers and water heaters.
Plumbing: new systems, water supply piping, drain-waste-vent work, water heaters, sewer connections, adding or moving fixtures, and major repairs.
Electrical: new service, service upgrades, panel replacements, new circuits, rewiring, permanent generators, permanent wiring for HVAC, EV chargers, and most other electrical alterations.
Gas: new piping, appliance installations, line extensions, and meter relocations or upgrades.
Use changes: turning non-habitable space into habitable space, and accessory dwelling units. A basement walkout needs a permit and may create an ADU, which needs Planning approval.
Site structures:
- Accessory buildings over 200 square feet, or with more than one story. A shed of 200 square feet or less still needs a permit if it has electrical, plumbing or mechanical work.
- Conex containers over 350 square feet, or connected to other containers
- Retaining walls over 24 inches that hold back a surcharge (tiered walls count), or over 48 inches without one
- Permanent pools and above-ground pools taller than 24 inches; outdoor pools need a fence at least 6 feet high
- In-ground spas and hot tubs
- Attached awnings and patio covers, and solar systems (submitted electronically)
No permit needed
The handout's exemption list includes one-story detached sheds of 200 square feet or less, fences 7 feet or less, retaining walls of 4 feet or less that don't hold a surcharge, concrete flatwork and driveways, painting, wallpaper, tile, carpet, cabinets, countertops and similar finish work, playground equipment, and above-ground pools under 24 inches. The city notes that anything not exempt generally requires a permit.
Dark-sky lighting
Eagle Mountain's exterior lighting requirements come from a November 2014 ordinance (Municipal Code 17.56). All exterior lighting must use full cut-off, dark-sky compliant fixtures, and uplighting is banned except for government flags. The rule applies to homes with an active permit, and final inspection will not pass until the builder proves compliance. When an electrician or builder picks porch, garage or landscape lights, ask for fixtures labeled "Full Cutoff" or "Dark Sky Compliant."
Wildfire: the WUI map and defensible space
The city code adopts a Wildland Urban Interface Area Map (Section 15.95.030, Ordinance O-04-2026). Under Section 15.10.360, owners, including individual homeowners and HOAs, must keep adequate defensible space as a fire break under the state fire rules, and every construction and staging area must keep at least 30 feet of defensible space for the whole project. In July 2026 the City Council discussed WUI landscaping standards aimed at 30 feet of defensible space around homes inside the WUI boundary (July 21, 2026 minutes). Ask the city whether your lot is inside the boundary before you plan landscaping, a deck or an addition.
Design numbers your contractor should use
The city's design criteria (revised July 2026) list a 30-inch frost depth, seismic design category D2 for homes, residential wind speeds of 100 to 105 mph (115 mph for accessory buildings), ice-shield underlayment, and residential snow loads taken from Utah State University's snow load site. Each new-home lot needs a soils observation report. Homes in flood zones A or V must meet IRC R322. The city enforces the 2021 IRC and the 2024 editions of the other I-codes with state amendments. See Utah's seismic and snow-load rules.
Inspections
From the inspections handout and FAQs:
- All inspections are requested by email to [email protected], with the permit number, inspection type, requested day and contact details.
- You're not on the schedule until you get a confirmation email. Inspections are first come, first served.
- Cancellations must be emailed before 9 am. Power inspections need the Rocky Mountain Power work order number.
- Timed inspections are reserved for footings, foundations and basement finishes.
- The builder must call Blue Stakes of Utah before digging.
- New homes need front and side yards landscaped before occupancy. In winter, a $2,000 per-lot escrow lets you finish within six months.
Doing the work yourself
The Building Department page links the DOPL Owner/Builder Certification Agreement, which you file with the city. It follows Utah Code 58-55-305(1)(d): for a new home you must be the sole owner, it must be the only home you've built this year, and you can't have built more than three in five years. The work must be done by you, a licensed contractor, your own employees covered by workers' comp, or unpaid helpers under your supervision. The form warns that paying an unlicensed person for work that needs a license can be a Class A misdemeanor, with administrative fines up to $2,000 a day.
Check the contractor
Search the business on DOPL's license lookup. Under the handyman exemption in Utah Code 58-55-305(1)(h), an unlicensed person may take repair or remodel jobs under $7,000, but plumbing and electrical work still needs a licensed contractor and HVAC work a licensed HVAC contractor. The Utah licensing guide explains the license classes.
Before you sign
- Get the DOPL license number and look it up.
- Confirm the permit covers every trade on the job (a basement finish with a new furnace and circuits is still permitted work).
- Specify dark-sky compliant exterior fixtures in writing.
- If the lot is in the WUI area, keep 30 feet of defensible space around the work and staging area.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step, and Utah's permit rules explain the statewide framework. Nearby, see Saratoga Springs and Lehi, or all of Utah County. Browse Eagle Mountain plumbers, electricians, HVAC contractors, roofers, remodelers, landscapers and concrete contractors.
Sources
- Eagle Mountain, Building Department: portal, deck, pool, retaining wall, accessory building and walkout rules, inspection scheduling, owner-builder form.
- Eagle Mountain, What Requires a Building Permit: permit list, exemptions, address, building phone.
- Eagle Mountain, Residential Building Permit FAQs: review times, fees, expiration, inspections.
- Eagle Mountain, Inspections Required.
- Eagle Mountain, Exterior Lighting Requirements: dark-sky ordinance, EMMC 17.56.
- Eagle Mountain, Design Criteria (rev. 7/2026).
- Eagle Mountain Municipal Code 15.95 (WUI Area Map) and 15.10.360 (defensible space).
- Eagle Mountain City Council minutes, July 21, 2026: WUI standards discussion.
- DOPL Owner/Builder Certification Agreement and Utah Code 58-55-305.
- DOPL license lookup.
Frequently asked questions
Do I need a permit to replace a furnace or water heater in Eagle Mountain?
Yes. The city's What Requires a Building Permit handout lists installing or replacing furnaces, heat pumps, air conditioners and water heaters, along with gas appliance installations.
Does a deck need a permit in Eagle Mountain?
An attached deck, or one 30 inches or more above grade at any point, needs a permit. The city measures height 36 inches out from the deck edge, then down to grade. A low freestanding deck that doesn't need guardrails is exempt.
How do I schedule an inspection in Eagle Mountain?
Email [email protected] with the permit number, inspection type, requested day and your contact details. You are not on the schedule until you get a confirmation email. Cancellations must be emailed before 9 am.
What is the dark-sky rule in Eagle Mountain?
Since a November 2014 ordinance (Eagle Mountain Municipal Code 17.56), all exterior lighting must use full cut-off, dark-sky compliant fixtures, and uplighting is banned except for government flags. Final inspections don't pass until the builder shows compliance.