Contractors in Saratoga Springs, Utah
Utah County • Population: 61,397
Showing 0 verified contractors
No contractors found in Saratoga Springs yet
Check back soon or browse other cities.
Quick answer
Saratoga Springs handles every building permit through its paperless Cityworks Public Portal, and a single-family application needs a $200 non-refundable deposit at submittal. Basement finishes, sheds over 200 square feet and retaining walls 4 feet or taller need a building permit, and a SWPPP permit is required before any ground disturbance. Fences up to 6 feet don't need a permit, and inspections are requested by email.
Saratoga Springs' Building Department handles plan review, permits and inspections for new homes, additions, remodels and basement finishes. The department went fully paperless: you apply, upload plans, resubmit and pay online, then print the approved plans yourself for the job site.
Applying
From the city's Building page and Obtaining a Building Permit:
- Portal: the Cityworks Public Portal takes all submittals, resubmittals and payments. Portal questions go to [email protected].
- Deposit: every application needs a non-refundable deposit at submittal, applied to the permit cost: $200 for a single-family home, $500 for commercial or multi-family.
- Plans: plans and specifications come with every application, and they must cover only the building you're applying for. The Building Official may require plans by a licensed engineer or architect, and Utah-licensed engineer or architect plans are required when structural changes are needed.
- Other approvals: Planning and Zoning, Public Works and the Fire Department sign off before most building permits are issued.
- Review time: the city says single-family plans take about 10 working days.
- Changes: any change from the approved plans must be resubmitted before you make it.
- On site: after issue, the city emails a digital copy of the approved plans. Print a set at least 18 by 24 inches and keep all permit documents on site for inspections.
The Building Department is at City Hall, 319 S Saratoga Rd, and its phone is 801-766-6507. City office hours are Monday to Thursday 7 am to 6 pm and Friday 8 am to 5 pm, with limited inspections on Fridays.
What needs a permit
The city doesn't post a single list of every project type. Here is what its pages state:
- New homes, additions, remodels and basement finishes go through plan review and permit.
- Basement finishes have their own application. The basement permit page lists what the plan must show (each room's use, lights, outlets, smoke and CO detectors, room sizes, doors and windows, mechanical room and panel location) and the code minimums inspectors check, such as bedroom egress windows with at least 5.7 square feet of net opening and a sill no higher than 44 inches.
- Sheds and playhouses over 200 square feet need a building permit and inspections, and must meet the zone's accessory building setbacks. One-story sheds of 200 square feet or less don't need a permit but still must follow the setback and height rules in City Code 19.05.11.
- Retaining walls 4 feet or taller need a building permit, per the city's Fencing Code page.
- Ground disturbance: a SWPPP (stormwater) permit is required before any digging or grading starts. Questions go to [email protected].
If your project isn't on that list, such as a water heater, furnace or reroof, ask the Building Department before work starts.
Fences
From the Fencing Code page, which summarizes City Code 19.06:
- No building permit or Planning approval is needed for a fence 6 feet tall or less.
- Front-yard fences are limited to 3 feet, side and back yards to 6 feet.
- A perimeter fence up to 8 feet is allowed only in limited cases, with Planning approval, and then needs a building permit.
- Fences next to open space, parks, canals and trails must be semi-private.
- Barbed wire, chain link, razor and wire fences are not allowed, with exceptions for agricultural use, animals and sports courts.
- A pool lot must be fenced, and a pool less than 30 feet from a property line needs a view-obstructing wall or fence.
Design numbers your contractor should use
The city's Design Criteria page lists a 30-inch frost line, seismic design category D2, a 31 psf ground snow load and 30 psf roof snow load, and an assumed soil bearing capacity of 1,500 psf (1,200 psf in Dalmore Meadows). Plans in the city are reviewed under the 2021 IRC and the 2023 National Electrical Code with Utah's amendments. For how Utah sets seismic and snow loads, see the state code guide.
Fees
The city's 2026 building permit fee schedule uses the valuation table from Appendix AL of the 2021 IRC. For example, a job valued between $2,001 and $40,000 is $69 for the first $2,000 plus $11 for each additional $1,000.
Inspections
Request inspections by email at [email protected]. The basement permit page also lists 801-766-6507, extension 120, for inspection requests. Fridays have limited inspections.
Doing the work yourself
The city's Applications & Forms page has the Owner Builder Certificate, which the basement page says to file if the homeowner will do the work. It's the state DOPL form. Under Utah Code 58-55-305(1)(d), a sole owner may build on their own property for their own noncommercial use (no more than one home a year and three in five years, plus incidental structures such as a shed or detached garage). Work must be done by you, a licensed contractor, your own employees covered by workers' comp, or unpaid helpers under your direction.
Check the contractor
Search the business on DOPL's license lookup; the Building page also links to DOPL. Under the handyman exemption in Utah Code 58-55-305(1)(h), an unlicensed person may take repair or remodel jobs under $7,000, but plumbing and electrical work still needs a licensed contractor and HVAC work a licensed HVAC contractor. The Utah licensing guide explains the license classes.
Before you sign
- Get the DOPL license number and look it up.
- Confirm who submits in the portal and pays the deposit.
- For any digging, confirm the SWPPP permit is in place first.
- Keep the printed approved plans on site.
- Collect lien waivers before final payment (Utah lien law).
The hiring checklist covers each step, and Utah's permit rules explain the statewide framework. Nearby, see Eagle Mountain and Lehi, or all of Utah County. Browse Saratoga Springs plumbers, electricians, HVAC contractors, roofers, remodelers, fence builders and window and door installers.
Sources
- Saratoga Springs, Building: portal, SWPPP, on-site documents, phone, address, hours, inspection email, codes.
- Saratoga Springs, Obtaining a Building Permit: deposits, plan requirements, review time, shed rules.
- Saratoga Springs, Obtaining a Basement Permit: basement application, plan contents, code minimums, inspection extension.
- Saratoga Springs, Fencing Code: fence heights and approvals, retaining walls, pool fencing.
- Saratoga Springs, Design Criteria: frost line, seismic category, snow loads, soils.
- Saratoga Springs, Building Permit Fee Schedule 2026.
- Saratoga Springs, Applications & Forms: Owner Builder Certificate.
- Utah Code 58-55-305: owner-builder and handyman exemptions.
- DOPL license lookup.
Frequently asked questions
How do I apply for a building permit in Saratoga Springs?
Through the city's Cityworks Public Portal. Submittals, resubmittals and payments are all paperless. Complete the application in full, upload every required document and pay the deposit ($200 for a single-family home) at submittal to avoid delays.
Do I need a permit to finish my basement in Saratoga Springs?
Yes. The city has a separate basement permit application in the portal. The plan must show each room's use, lights, outlets, smoke and carbon monoxide detectors, room dimensions, doors and windows, the mechanical room and the electrical panel.
Do I need a permit for a fence in Saratoga Springs?
Not for a fence 6 feet tall or less. Front-yard fences are limited to 3 feet. A perimeter fence up to 8 feet is allowed only in limited cases with Planning approval, and then it needs a building permit.
How do I schedule an inspection in Saratoga Springs?
Email [email protected]. The Building Department's phone is 801-766-6507, and the basement permit page lists extension 120 for inspection requests. All permit documents and a printed set of approved plans, at least 18 by 24 inches, must be on site.